Kitchen Remodeling
PREMIUM KITCHEN TRANSFORMATIONS

Kitchen RemodelingFrom Outdated to Outstanding

Complete kitchen transformation in 4-6 weeks. Every phase expertly managed, every detail crafted to perfection.

4-6 Weeks
Typical Timeline
11 Phases
Detailed Process
$25K-$80K
Investment Range
100%
Satisfaction Guaranteed

11-Phase Remodeling Process

Every kitchen transformation follows our proven process. Click any phase to see detailed steps.

Phase 1: Planning & Design
1
5-7 days

Phase 1: Planning & Design

4 key steps

Initial Consultation & Site Visit

3D Design & Material Selection

+2 more steps
Phase 2: Demolition & Protection
2
2-3 days

Phase 2: Demolition & Protection

5 key steps

Home Protection Setup

Appliance Disconnection & Removal

+3 more steps
Phase 3: Rough-In & Infrastructure
3
3-5 days

Phase 3: Rough-In & Infrastructure

5 key steps

Structural Assessment & Modifications

Electrical Rough-In

+3 more steps
Phase 4: Drywall & Surface Prep
4
3-4 days

Phase 4: Drywall & Surface Prep

3 key steps

Drywall Installation & Repair

Drywall Finishing

+1 more steps
Phase 5: Flooring Installation
5
2-3 days

Phase 5: Flooring Installation

3 key steps

Subfloor Preparation

Flooring Installation

+1 more steps
Phase 6: Cabinet Installation
6
2-3 days

Phase 6: Cabinet Installation

4 key steps

Cabinet Preparation & Layout

Upper Cabinet Installation

+2 more steps
Phase 7: Countertop Installation
7
2-3 days

Phase 7: Countertop Installation

3 key steps

Template Creation

Fabrication at Deluxe Art Stone

+1 more steps
Phase 8: Backsplash Installation
8
2-3 days

Phase 8: Backsplash Installation

3 key steps

Backsplash Layout & Prep

Tile Installation

+1 more steps
Phase 9: Plumbing & Electrical Finish
9
2 days

Phase 9: Plumbing & Electrical Finish

3 key steps

Plumbing Fixture Installation

Electrical Trim-Out

+1 more steps
Phase 10: Painting & Finishing
10
2-3 days

Phase 10: Painting & Finishing

3 key steps

Paint Preparation

Wall & Ceiling Painting

+1 more steps
Phase 11: Final Details & Cleanup
11
1-2 days

Phase 11: Final Details & Cleanup

4 key steps

Final Adjustments

Deep Clean

+2 more steps

Week-by-Week Overview

A simplified view of what to expect each week of your kitchen remodel

1

Week 1

Planning & Demolition

  • Final design approval and permit acquisition
  • Protection setup and demolition begins
  • Complete removal of old kitchen
  • Initial rough-in work starts
2

Week 2

Infrastructure Work

  • Electrical and plumbing rough-in
  • Structural modifications if needed
  • HVAC adjustments
  • Rough-in inspections passed
3

Week 3

Surface Prep & Flooring

  • Drywall installation and finishing
  • Ceiling work completed
  • Flooring installation
  • Surfaces ready for cabinets
4

Week 4

Cabinets & Countertops

  • Cabinet installation completed
  • Countertop template and fabrication
  • Countertop installation
  • Backsplash tile work begins
5

Week 5

Finishing Touches

  • Backsplash completion
  • Painting and trim work
  • Plumbing and electrical fixtures
  • Appliance installation and testing
6

Week 6 (Days 1-3)

Final Details

  • Final adjustments and touch-ups
  • Deep cleaning
  • Client walkthrough and training
  • Project completion

Popular Upgrades & Add-Ons

Enhance your kitchen with these common upgrade options

Structural Enhancements

  • Wall removal for open concept (with engineered support)
  • Kitchen island addition
  • Peninsula counter extension
  • Coffered or tray ceiling installation

Advanced Electrical

  • Smart home integration (automated lights, switches)
  • USB charging outlets
  • Under-cabinet LED lighting with dimming
  • Pendant light fixtures over island
  • Electrical panel upgrade (if needed for added load)

Premium Plumbing

  • Pot filler faucet at range
  • Instant hot water dispenser
  • Touchless faucet with pull-down spray
  • Filtered water system
  • Prep sink in island
  • Gas line for range (if converting from electric)

Specialty Features

  • Custom range hood with decorative surround
  • Built-in wine refrigerator
  • Appliance garage with tambour door
  • Pull-out spice racks and organizers
  • Soft-close drawer slides and door hinges
  • Custom pantry organization system

Important Considerations

What you need to know before starting your kitchen remodel

Living During Remodel

Your kitchen will be unusable for 2-3 weeks during peak construction. We recommend setting up a temporary kitchen in another room with microwave, coffee maker, and mini fridge. Many clients eat out more during this period.

Dust & Noise Management

Despite plastic barriers, some dust will escape. We vacuum daily and use air scrubbers when possible. Construction noise typically runs 7:30 AM - 4:30 PM weekdays. We respect your home and neighbors.

Timeline Variables

While 20 days is typical, timelines can extend due to: custom cabinet lead times (6-8 weeks), stone slab availability, permit delays, discovery of unexpected issues (plumbing, electrical, structural), or change orders requested mid-project.

Design Decisions Timing

All major decisions (cabinet style, countertop, flooring, backsplash, paint colors, hardware) must be finalized BEFORE demolition starts. Changes after work begins cause delays and added costs.

INTEGRATED SERVICES

Premium Stone CountertopsIn-House Fabrication

We fabricate our own countertops at Deluxe Art Stone, giving you access to 300+ premium slabs of granite, quartz, and exotic stones - all with faster turnaround and better pricing. Our in-house fabrication means better quality control, faster installation, and seamless coordination.

START YOUR TRANSFORMATION

Ready to Transform Your Kitchen?

Get your free consultation and detailed estimate today. We'll walk you through every phase, answer all your questions, and create a custom plan for your dream kitchen.