11-Phase Remodeling Process
Every kitchen transformation follows our proven process. Click any phase to see detailed steps.

Phase 1: Planning & Design
Initial Consultation & Site Visit
3D Design & Material Selection

Phase 2: Demolition & Protection
Home Protection Setup
Appliance Disconnection & Removal

Phase 3: Rough-In & Infrastructure
Structural Assessment & Modifications
Electrical Rough-In

Phase 4: Drywall & Surface Prep
Drywall Installation & Repair
Drywall Finishing

Phase 5: Flooring Installation
Subfloor Preparation
Flooring Installation

Phase 6: Cabinet Installation
Cabinet Preparation & Layout
Upper Cabinet Installation

Phase 7: Countertop Installation
Template Creation
Fabrication at Deluxe Art Stone

Phase 8: Backsplash Installation
Backsplash Layout & Prep
Tile Installation

Phase 9: Plumbing & Electrical Finish
Plumbing Fixture Installation
Electrical Trim-Out

Phase 10: Painting & Finishing
Paint Preparation
Wall & Ceiling Painting

Phase 11: Final Details & Cleanup
Final Adjustments
Deep Clean
Week-by-Week Overview
A simplified view of what to expect each week of your kitchen remodel
Week 1
Planning & Demolition
- Final design approval and permit acquisition
- Protection setup and demolition begins
- Complete removal of old kitchen
- Initial rough-in work starts
Week 2
Infrastructure Work
- Electrical and plumbing rough-in
- Structural modifications if needed
- HVAC adjustments
- Rough-in inspections passed
Week 3
Surface Prep & Flooring
- Drywall installation and finishing
- Ceiling work completed
- Flooring installation
- Surfaces ready for cabinets
Week 4
Cabinets & Countertops
- Cabinet installation completed
- Countertop template and fabrication
- Countertop installation
- Backsplash tile work begins
Week 5
Finishing Touches
- Backsplash completion
- Painting and trim work
- Plumbing and electrical fixtures
- Appliance installation and testing
Week 6 (Days 1-3)
Final Details
- Final adjustments and touch-ups
- Deep cleaning
- Client walkthrough and training
- Project completion
Popular Upgrades & Add-Ons
Enhance your kitchen with these common upgrade options
Structural Enhancements
- Wall removal for open concept (with engineered support)
- Kitchen island addition
- Peninsula counter extension
- Coffered or tray ceiling installation
Advanced Electrical
- Smart home integration (automated lights, switches)
- USB charging outlets
- Under-cabinet LED lighting with dimming
- Pendant light fixtures over island
- Electrical panel upgrade (if needed for added load)
Premium Plumbing
- Pot filler faucet at range
- Instant hot water dispenser
- Touchless faucet with pull-down spray
- Filtered water system
- Prep sink in island
- Gas line for range (if converting from electric)
Specialty Features
- Custom range hood with decorative surround
- Built-in wine refrigerator
- Appliance garage with tambour door
- Pull-out spice racks and organizers
- Soft-close drawer slides and door hinges
- Custom pantry organization system
Important Considerations
What you need to know before starting your kitchen remodel
Living During Remodel
Your kitchen will be unusable for 2-3 weeks during peak construction. We recommend setting up a temporary kitchen in another room with microwave, coffee maker, and mini fridge. Many clients eat out more during this period.
Dust & Noise Management
Despite plastic barriers, some dust will escape. We vacuum daily and use air scrubbers when possible. Construction noise typically runs 7:30 AM - 4:30 PM weekdays. We respect your home and neighbors.
Timeline Variables
While 20 days is typical, timelines can extend due to: custom cabinet lead times (6-8 weeks), stone slab availability, permit delays, discovery of unexpected issues (plumbing, electrical, structural), or change orders requested mid-project.
Design Decisions Timing
All major decisions (cabinet style, countertop, flooring, backsplash, paint colors, hardware) must be finalized BEFORE demolition starts. Changes after work begins cause delays and added costs.
Premium Stone CountertopsIn-House Fabrication
We fabricate our own countertops at Deluxe Art Stone, giving you access to 300+ premium slabs of granite, quartz, and exotic stones - all with faster turnaround and better pricing. Our in-house fabrication means better quality control, faster installation, and seamless coordination.